Kanban WIP limits: the sticky note rule that stops thrash
A 5-beat faceless video outline for “Kanban WIP limits: the sticky note rule that stops thrash” in the Productivity software tutorials niche, derived from caption timing of 2 reference videos.
Angles
- State why WIP limits exist before any tool demo: stop thrash, finish work
- Show a simple calculate-and-set method for column limits
- Contrast unlimited columns (busy boards) vs capped columns (flow)
- Close on a sticky-note rule card teams can try Monday
Beat-by-beat structure
- Hook (0:00–0:30): a board full of started tasks — promise the limit that finishes them.
- Why (0:30–2:00): context switching cost and blocked work hiding in progress.
- How to set (2:00–4:30): start from team size / observed throughput; adjust weekly.
- Visual (4:30–6:00): red when over limit; pull only when a slot opens.
- Recap. Original narration only.
Reference videos
- How to Calculate WIP Limits for Kanban (and Why You Should)
2BPpaNR-5HY - Kanban WIP limits: Why limit work in progress?
bgTxEkcWX0A
Method
yt-dlp VTT captions (manual/uploader only) → timed beat heuristics → editorial topic synthesis (no ASR). Structure only; write original narration.